The scope of work includes replacing the 14-inch, 8-inch, and 4-inch water line on DR MLK JR BLVD.
from Clift Street to S Young Street.
Contractors will be installing approximately 2,700 linear feet of new 8-inch and 400 linear feet of 16-inch water lines.
Once the utilities are completed, there will be demolition of some existing driveways and roadway pavement in addition to installing 5-foot sidewalks.
Project started: January 2026
Crew has mobilized, and traffic control is in place.
They have started excavating and installing water lines.
Crews are working on pushing casing in at Station 4+60 to Station 3+00 and also boring under MLK at the Tuggle St.
Wed, 19 Aug 2026 13:20 -0600
Analysis: This retained record is a bounded snapshot of what the approved source reported on the stated date. Readers should consult the complete source and later official updates before relying on timing, scope, cost, outcomes, or effects on a specific person or property; those questions require separate, current evidence.